The Bishop of Hereford Bluecoat school gymnasium hall sanded and lacquered
07
August
2015
Bishops of Hereford bluecoat school gymnasium floor refurbishment
Before
The sports hall laquer was wearing from the floor leaving the wood susceptable to water and other damage.
After
The existing gymnasium teak strip wood floor also required repairs before sanding and then priming with 3 coats of with a very hard wearing quality laquer to protect the floor and the basket ball players !
Now also with newly installed basket ball linage - done by others betweeen the laquer coats .